On October 27, the company learned from the ministry that to promote the lead battery industry structural adjustment and industrial upgrading, from the source to prevent blood lead pollution incident, the department of industry and information technology, consumer goods industry in 2012 published "the lead battery industry access conditions" and "the lead battery industry admittance notice management interim measures" were revised, formed the lead battery industry standard conditions (draft) "and" the lead battery industry standard announcement management regulations (draft) ".
In this paper, the lead battery industry standard conditions (draft) "of the main window.
Read one: land for construction, reconstruction of lead battery project specification
1, the project must be at or above the county level industrial park
Paper pointed out that the construction and reconstruction projects should be approved for establishment in accordance with the construction of industrial park, at or above the county level shall conform to the "standard of lead battery factory for health protection distance" (GB11659) or the environmental impact assessment report in the approval of the health protection distance requirements.
Conditional region existing production enterprises should be gradually move to industrial park.Heavy metal pollution prevention and control key areas it is prohibited to construct new lead battery and lead components production projects.All new and renewal project must have a location above city-level environmental protection departments determine the source of heavy metal pollutant total amount.
2, bar type such as protected farmland land within the scope of construction
Nature reserve of all types and at all levels, cultural sites, environmentally sensitive areas, such as general plans for land use and determine the range of arable land and basic farmland protection, prohibited construction and reconstruction of lead-acid batteries and leaded components production projects.
Read 2: requirements for project capacity
1, the construction and reconstruction of lead battery production enterprises (projects), after the completion of the same plant annual production capacity should not be less than 500000 kva (calculated on a single class 8 hours).
2, existing lead-acid battery production enterprises (projects) in the same factory annual production capacity should not be less than 200000 kva;Existing goods plate (in the form of battery accessories foreign sales lead battery with plate) production enterprises (projects), in the same factory plate production capacity should not be less than 1 million kva.
3, coiling, bipolar, lead, carbon batteries (super battery), and other new type lead-acid batteries, or use continuous (extended net, punching net, continuous casting and rolling, etc.) production program of plate production process, without being limited by the production capacity.
Read three: do not conform to the standard conditions of construction project
Paper does not satisfy the conditions for the specification of construction project do the special specification, including the following three conditions, production does not meet the requirements for the specification of the project:
1, open type ordinary lead-acid batteries (refers to the structure of acid mist unfiltered give expulsion-typely, internal and external pressure consistent lead battery) production project.
2, dry charged lead battery (internal do not contain electrolytes, plate for dry and in the charged state of lead-acid batteries) production project.
3, cadmium content higher than 0.002% (battery quality percentage, similarly hereinafter) or arsenic content higher than 0.1% lead battery and lead components production projects.
Read four: ban the production technology and equipment
Construction and reconstruction of enterprises (projects) and the existing enterprise, process equipment and related supporting facilities are prohibited:
1, use open casting molten lead pot and manual board, manual cast lead parts, manual cast lead electrode such as backward technology.All the gravity casting plate gate process, shall be implemented for lead concentrate (refers to using a molten lead the furnace for more than two casting machine for lead).
2, banning the use of open type lead powder machine and artificial lose powder technology.
3, banning the use of open type and compound machine.
4, ban use manual plate coating;Dry powder filling process is prohibited.
5, scrub brush board (ears) process should be located in an enclosed workshop, adopt manual operation process is prohibited.
6, for acid process should adopt automatic mixed acid system, closed acid conveying system and automatic filling equipment, ban on using artificial with acid and acid process.
7, into, charging process should be located in an enclosed workshop, equipped with and adapt to the production of sulfuric acid mist collecting device and disposal facilities, keep in micro under negative pressure environment to produce;Adopts the externalized into process into a slot should be closed, and maintain the local negative pressure environment to produce, externalization into adopt manual welding process is prohibited.Feedback type should be used to charge and discharge machine using discharge energy feedback, resistance must not be used as consumption.All the construction and reconstruction projects, externalized into process is prohibited.
8, automatic welding process must be used to burn aluminothermic welding machines and other automated production equipment, welding machine and automatic ban use manual welding process.
Read five: to the environment protection and occupational health and safety requirements
1, all enterprises must strictly abide by the law of the People's Republic of China environmental protection act, the law of the People's Republic of China on environmental impact assessment law "and other relevant laws and regulations, and shall be implemented strictly in accordance with the law for examination and approval of environment impact assessment, environmental protection facilities" three at the same time "(environmental protection facilities of construction projects and major projects designed, constructed and put into use at the same time) completion inspection and acceptance, application of sewage, drainage capture and emission permits system;The discharge of major pollutants must meet the requirements of total amount control index, and the main characteristics of pollutants and stabilize pollutants discharging standard;Must be compulsory for review and acceptance by evaluating cleaner production.Make full use of the environment of public information, to understand the status of the lead battery enterprises of environmental protection.To deal with information system in environmental administrative punishment cases, environmental protection special action schedule of illegal enterprises and national key pollution source monitoring enterprise supervision and detection information system environment such as illegal illegal information exist in the information system of enterprises, need to provide give punishment opinions issued by the competent department of environmental protection at the same level of the rectification of qualified proof materials, to apply on compliance conditions enterprises list announcement.
2, construction, rehabilitation and expansion project should undertake the pre-assessment of occupational diseases and the occupational-disease-prevention facilities design, the approval to start construction.The occupational-disease-prevention facilities should be simultaneously with the principal part of design, construction, investment and at the same time the production and use;A period of 12 months shall be run in occupational disease hazard control effect assessment;After receiving qualified occupational-disease-prevention facilities experience, can put into production and use.
Read six: energy saving and recycling
1, lead battery production enterprises should actively perform producer responsibility system, the old lead battery recycling system was established based on the sales channels, or entrust regeneration with hazardous waste management license to lead enterprises and other relevant units to effective recycling of waste lead accumulator.Enterprises shall not purchase does not conform to the requirements of environmental protection of secondary lead products as raw materials.
2, lead battery production enterprises use sales channels are encouraged to set up old lead battery recycling mechanism, and conform to the requirements of the relevant industrial policies of renewable lead enterprise jointly set up waste battery recycling system.
Read 7: supervision and management
1, about the cleaner production.
Existing lead-acid batteries and leaded parts production enterprises should reach the battery industry cleaner production evaluation index system (trial) "(national development and reform commission announcement no. 87) specified in the" clean production enterprise "level, or to achieve the clean production standards Lead battery industry "(HJ 447) specified in the tertiary level;Construction, reconstruction projects should reach the battery industry cleaner production evaluation index system (trial) "specified in the" advanced enterprise of cleaner production ", or to achieve the clean production standards Specified in the lead battery industry, the secondary level.
2, the enterprise is not in conformity with the specification conditions shall not be put on record, and shall not go through the formalities of land
Does not satisfy the conditions for this specification lead-acid batteries and leaded components production projects, investment management department shall not be put on record (approval);Department of land and resources shall not issue a land related procedures;Financial institutions do not provide any form of new credit support;Urban and rural planning and construction, fire control, hygiene, quality and safety supervision department does not grant to deal with relevant formalities.Application or to issue production licenses to enterprises, shall conform to the requirements of this international standard conditions.On the list of corporate audit if it meets the requirements of this specification of industry and information technology ministry will inform relevant departments.
3, the production or purchase goods plate enterprise, should declare to the competent department of industry and information technology at the provincial level plate sales or purchasing records, the plate must not be sold to enterprise is not in conformity with the conditions of this specification, and shall not purchase if it meets the requirements of this specification plate of enterprise production.
4, enterprise self checking and report to the competent authority.
All lead battery and lead parts production enterprises, should be released after the condition of this specification, to conform to the specifications in accordance with the principle of voluntary condition checking, and introspects the provincial department in charge of industry and information technology for review.
This specification condition since the date of release immediately.The lead battery industry access conditions (ministry of industry and information technology environment protection department no.18 2012 announcement) shall be repealed simultaneously.